Phase 15 Integration Test Report

Date: 2026-06-25
Status: Blocked for current release candidate

Summary

Phase 14 recorded four passing demo-service integration tests. Phase 15 discovered that CI did not execute this suite and corrected the workflow, but the final suite could not run locally.

Executed evidence

  • CI now contains pnpm test:integration.
  • Static validator confirms the integration gate remains configured.
  • Historical Phase 14 integration tests cover success, idempotent transport, normalized failure, and timeout.

Unexecuted or blocked evidence

  • Current Vitest integration execution.
  • Production/sandbox CRM, scheduler, email, and durable idempotency integrations do not exist.

Release disposition

The integration gate is blocked until connected CI executes the suite and approved vendor adapters exist.