Phase 15 Integration Test Report
Date: 2026-06-25
Status: Blocked for current release candidate
Summary
Phase 14 recorded four passing demo-service integration tests. Phase 15 discovered that CI did not execute this suite and corrected the workflow, but the final suite could not run locally.
Executed evidence
- CI now contains
pnpm test:integration. - Static validator confirms the integration gate remains configured.
- Historical Phase 14 integration tests cover success, idempotent transport, normalized failure, and timeout.
Unexecuted or blocked evidence
- Current Vitest integration execution.
- Production/sandbox CRM, scheduler, email, and durable idempotency integrations do not exist.
Release disposition
The integration gate is blocked until connected CI executes the suite and approved vendor adapters exist.