# Phase 15 Integration Test Report **Date:** 2026-06-25 **Status:** Blocked for current release candidate ## Summary Phase 14 recorded four passing demo-service integration tests. Phase 15 discovered that CI did not execute this suite and corrected the workflow, but the final suite could not run locally. ## Executed evidence - CI now contains `pnpm test:integration`. - Static validator confirms the integration gate remains configured. - Historical Phase 14 integration tests cover success, idempotent transport, normalized failure, and timeout. ## Unexecuted or blocked evidence - Current Vitest integration execution. - Production/sandbox CRM, scheduler, email, and durable idempotency integrations do not exist. ## Release disposition The integration gate is blocked until connected CI executes the suite and approved vendor adapters exist.