phase 16 implementation
This commit is contained in:
@@ -0,0 +1,23 @@
|
||||
# Phase 15 Repository Integrity Audit
|
||||
|
||||
**Date:** 2026-06-25
|
||||
**Status:** Passed for static package integrity
|
||||
|
||||
## Summary
|
||||
|
||||
The baseline manifest passed before changes. The Phase 15 audit checks JSON/CSV structure, symlinks, generated files, secret patterns, reserved test email domains, runtime URLs, dependency pinning, and release-control invariants.
|
||||
|
||||
## Executed evidence
|
||||
|
||||
- Baseline manifest: 466 files verified.
|
||||
- Baseline audit exposed 4 High and 7 Medium findings.
|
||||
- Current audit reports zero findings under the same controls.
|
||||
|
||||
## Unexecuted or blocked evidence
|
||||
|
||||
- Final package manifest validation occurs after all reports are generated.
|
||||
- Git commit history was not supplied and cannot be audited.
|
||||
|
||||
## Release disposition
|
||||
|
||||
Static repository integrity is acceptable, but it does not replace build, dependency, browser, or human QA evidence.
|
||||
Reference in New Issue
Block a user