Phase 15 Repository Integrity Audit

Date: 2026-06-25
Status: Passed for static package integrity

Summary

The baseline manifest passed before changes. The Phase 15 audit checks JSON/CSV structure, symlinks, generated files, secret patterns, reserved test email domains, runtime URLs, dependency pinning, and release-control invariants.

Executed evidence

  • Baseline manifest: 466 files verified.
  • Baseline audit exposed 4 High and 7 Medium findings.
  • Current audit reports zero findings under the same controls.

Unexecuted or blocked evidence

  • Final package manifest validation occurs after all reports are generated.
  • Git commit history was not supplied and cannot be audited.

Release disposition

Static repository integrity is acceptable, but it does not replace build, dependency, browser, or human QA evidence.