# Phase 15 Integration Test Report
|
||||
|
||||
**Date:** 2026-06-25
|
||||
**Status:** Blocked for current release candidate
|
||||
|
||||
## Summary
|
||||
|
||||
Phase 14 recorded four passing demo-service integration tests. Phase 15 discovered that CI did not execute this suite and corrected the workflow, but the final suite could not run locally.
|
||||
|
||||
## Executed evidence
|
||||
|
||||
- CI now contains `pnpm test:integration`.
|
||||
- Static validator confirms the integration gate remains configured.
|
||||
- Historical Phase 14 integration tests cover success, idempotent transport, normalized failure, and timeout.
|
||||
|
||||
## Unexecuted or blocked evidence
|
||||
|
||||
- Current Vitest integration execution.
|
||||
- Production/sandbox CRM, scheduler, email, and durable idempotency integrations do not exist.
|
||||
|
||||
## Release disposition
|
||||
|
||||
The integration gate is blocked until connected CI executes the suite and approved vendor adapters exist.
|
||||