3.2 KiB
3.2 KiB
| 1 | Gate | Severity | Status | Evidence | Owner | Exit_criteria | Accepted_exception |
|---|---|---|---|---|---|---|---|
| 2 | Supplied Phase 14 package integrity | High | Passed | C15-001 | Engineering | Manifest validates fresh extraction | No |
| 3 | Phase 15 static validators | High | Passed | C15-004 | Engineering + QA | All dependency-free validators pass | No |
| 4 | Repository integrity and secret/PII fixture audit | High | Passed | C15-006 | Engineering + Security + Privacy | Zero Critical/High/Medium findings | No |
| 5 | Exact Node 24.17.0 and pnpm 11.9.0 frozen install | High | Blocked | C15-002; C15-003 | Engineering + Security | Connected clean environment completes frozen install | No |
| 6 | Format, lint, strict typecheck, unit, integration, and production build on final manifest | High | Blocked | C15-009 through C15-020 | Engineering + QA | All commands exit zero on final manifest | No |
| 7 | Dependency and license audit | High | Blocked | C15-021 | Security + Legal | Registry-backed audit and configured license check pass | No |
| 8 | Cross-browser functional execution | High | Blocked | C15-014; P14-008 | QA | Chromium, Firefox, WebKit, mobile Chrome, mobile Safari pass | No |
| 9 | Automated accessibility execution | High | Blocked | C15-015; P14-008 | Accessibility + QA | Axe matrix passes with reviewed exceptions | No |
| 10 | Manual keyboard, screen-reader, zoom, reflow, forced-colors, and RTL review | High | Blocked | MANUAL_TEST_MATRIX_v1.0.csv | Accessibility + QA + Localization | Human matrix completed with evidence | No |
| 11 | Visual-regression baseline generation and approval | High | Blocked | C15-016; VISUAL_REGRESSION_REPORT_v1.0.md | Design + QA | Pinned Chromium baselines generated and all diffs reviewed | No |
| 12 | Performance and bundle budgets | High | Blocked | PERFORMANCE_REPORT_v1.0.md; BUNDLE_ANALYSIS_REPORT_v1.0.md | Engineering | Final build measured against approved budgets | No |
| 13 | Production-like deployment and rollback rehearsal | High | Blocked | DEPLOYMENT_REHEARSAL_REPORT_v1.0.md; ROLLBACK_REHEARSAL_REPORT_v1.0.md | Infrastructure + Engineering | Documented rehearsal succeeds and is timed | No |
| 14 | Approved CRM/lead destination | High | Blocked | P14-001 | Sales Ops + Engineering | Approved vendor, credentials, mapping, retries, duplicates, sandbox, monitoring | No |
| 15 | Approved legal/privacy/form processing | High | Blocked | P14-002 | Legal + Privacy | Localized notice, legal basis, consent, retention, deletion, recipients, transfers approved | No |
| 16 | Approved analytics provider and consent | High | Blocked | P14-003 | Analytics + Legal | Provider, DPA, consent, region, retention, event policy approved | No |
| 17 | Distributed idempotency and abuse controls | High | Blocked | P14-004; P9-002 | Engineering + Sales Ops | Durable store, rate limit, duplicate policy, monitoring validated | No |
| 18 | Native French and Arabic review | High | Open | P9-005 | Localization + Content | Native reviewers approve all visible and metadata strings | No |
| 19 | Participant and accessibility acceptance research | Critical | Blocked | P9-001 | Research + Product | Required cohorts completed; S0/S1 findings fixed and retested | No |
| 20 | Canonical domain, brand assets, and public destinations | High | Blocked | P10-001; P10-002; destination registry | Product + Infrastructure + Design | Approved production origin, logo, legal, login, sales, support, tour, pricing destinations | No |
| 21 | Final source-control commit identity | Medium | Blocked | Supplied ZIP contains no .git metadata | Engineering | Commit final manifest and record immutable SHA | No |