5.1 KiB
Phase 16 Final Implementation and Launch Report
1. Executive summary
Launch was rejected and aborted before deployment. 18 dependency-free checks passed, but the exact runtime, dependency-backed, browser, human, business, legal, operational, infrastructure, and production evidence is missing.
2. Phase 15 release recommendation
The Phase 15 recommendation of not ready was upheld without reinterpretation.
3. Final blocker disposition
Four Phase 15 defects remain resolved; aggregate blocker P15-005 remains open. Cumulative issue counts remain Critical 1, High 21, Medium 17, Low 2.
4. Final release-gate status
3 gates are approved from static evidence; 29 are blocked pending evidence.
5. Accepted exceptions
None.
6. Product approval
Blocked pending named product approver and final artifact.
7. Content approval
Blocked pending final approved EN/FR/AR copy and metadata.
8. Claims and evidence approval
Blocked. Research-only or pending evidence must remain suppressed.
9. Customer evidence approval
Blocked. No written customer permission was supplied.
10. Legal approval
Blocked. No approved terms, legal entity record, or localized legal text was supplied.
11. Privacy approval
Blocked. No approved policy, basis, recipients, retention, deletion, request process, or transfer disclosure was supplied.
12. Consent approval
Blocked. No approved consent categories, version, storage, withdrawal, or provider was supplied.
13. Analytics approval
Blocked. The current sink remains disabled and network-free.
14. Localization approval
Static parity passed; human approval blocked.
15. Arabic approval
Static RTL and logical CSS passed; native MSA and screen-reader review blocked.
16. French approval
Static parity passed; native linguistic review blocked.
17. Accessibility approval
Blocked pending browser automation and human keyboard, screen-reader, zoom, reflow, forced-colors, reduced-motion, mobile, and Arabic review.
18. Security approval
Static controls passed; dependency audit and live production checks blocked.
19. CRM and scheduler approval
Blocked. Vendors, accounts, credentials, mappings, duplicate rules, calendars, fallbacks, and owners are absent.
20. Asset approval
Blocked pending governed final brand and media assets.
21. Production architecture
Not supplied.
22. Production configuration
Safe defaults are documented; actual production values are absent.
23. Secret management
No production secrets were supplied or stored. Provisioning, scope, rotation, and revocation remain blocked.
24. Domain and DNS
Not supplied.
25. TLS
Not executed.
26. Security headers
Static configuration only; production responses unavailable.
27. CDN and caching
Not supplied or tested.
28. Search-engine configuration
Static foundations passed; live behavior unavailable.
29. Email readiness
Not configured and disabled.
30. Observability
Not configured for production.
31. Incident response
No named owners or channel.
32. Rollback readiness
No platform target or rehearsal.
33. Release-candidate freeze
No approved candidate frozen.
34. Targeted regression
18 dependency-free checks passed; all dependency-backed, browser, human, and production checks blocked.
35. Pre-launch validation
Rejected due missing production target and approvals.
36. Launch authorization
Rejected.
37. Deployment
Not executed.
38. DNS cutover
Not executed.
39. Production smoke tests
Not executed.
40. Controlled live submission
Not executed.
41. Live consent validation
Not executed.
42. Live analytics validation
Not executed.
43. Live CRM and scheduler validation
Not executed.
44. Live accessibility checks
Not executed.
45. Live localization and RTL checks
Not executed.
46. Live performance
Not executed.
47. Live security
Not executed.
48. Live privacy
Not executed.
49. Monitoring window
Not executed.
50. Incidents and hotfixes
None because no deployment occurred.
51. Rollback decision
Not applicable; launch was stopped before deployment.
52. Post-deployment verification
Not executed.
53. SEO verification
Not executed on a live domain.
54. Operational handoff
Not completed.
55. Deferred work
41 unresolved items are listed in the deferred-work register.
56. Final launch status
Launch aborted before deployment.
57. Files and configuration changed
Added Phase 16 governance, evidence, reports, validators, manifest support, decision log, and updated issue register. Application runtime behavior and production feature flags were not enabled.
58. Exact commands and platform actions
Recorded in COMMAND_AND_PLATFORM_ACTION_MATRIX_v1.0.csv and docs/quality/phase16-command-logs.
59. Final risks
Primary risks remain unobserved executable behavior, inaccessible or broken browser flows, unlawful data processing, incorrect lead destinations, absent operations, and unknown production infrastructure.
60. Next review date
After all Critical and High gates have named owners, evidence, and approvals. No arbitrary date was invented.