| 1 | Gate | Severity | Phase15_status | Phase16_decision | Evidence | Accountable_role | Named_owner | Condition_or_exit_criteria | Risk | Deadline | Monitoring_requirement | Rollback_or_mitigation | Accepted_exception |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 2 | Supplied Phase 14 package integrity | High | Passed | Approved | C15-001 | Engineering | Unassigned | Manifest validates fresh extraction | Controlled | Before launch | Gate review | Withhold launch | No |
| 3 | Phase 15 static validators | High | Passed | Approved | C15-004 | Engineering + QA | Unassigned | All dependency-free validators pass | Controlled | Before launch | Gate review | Withhold launch | No |
| 4 | Repository integrity and secret/PII fixture audit | High | Passed | Approved | C15-006 | Engineering + Security + Privacy | Unassigned | Zero Critical/High/Medium findings | Controlled | Before launch | Gate review | Withhold launch | No |
| 5 | Exact Node 24.17.0 and pnpm 11.9.0 frozen install | High | Blocked | Blocked pending evidence | C15-002; C15-003 | Engineering + Security | Unassigned | Connected clean environment completes frozen install | Release readiness cannot be established | Before launch | Gate review | Withhold launch | No |
| 6 | Format, lint, strict typecheck, unit, integration, and production build on final manifest | High | Blocked | Blocked pending evidence | C15-009 through C15-020 | Engineering + QA | Unassigned | All commands exit zero on final manifest | Release readiness cannot be established | Before launch | Gate review | Withhold launch | No |
| 7 | Dependency and license audit | High | Blocked | Blocked pending evidence | C15-021 | Security + Legal | Unassigned | Registry-backed audit and configured license check pass | Release readiness cannot be established | Before launch | Gate review | Withhold launch | No |
| 8 | Cross-browser functional execution | High | Blocked | Blocked pending evidence | C15-014; P14-008 | QA | Unassigned | Chromium, Firefox, WebKit, mobile Chrome, mobile Safari pass | Release readiness cannot be established | Before launch | Gate review | Withhold launch | No |
| 9 | Automated accessibility execution | High | Blocked | Blocked pending evidence | C15-015; P14-008 | Accessibility + QA | Unassigned | Axe matrix passes with reviewed exceptions | Release readiness cannot be established | Before launch | Gate review | Withhold launch | No |
| 10 | Manual keyboard, screen-reader, zoom, reflow, forced-colors, and RTL review | High | Blocked | Blocked pending evidence | MANUAL_TEST_MATRIX_v1.0.csv | Accessibility + QA + Localization | Unassigned | Human matrix completed with evidence | Release readiness cannot be established | Before launch | Gate review | Withhold launch | No |
| 11 | Visual-regression baseline generation and approval | High | Blocked | Blocked pending evidence | C15-016; VISUAL_REGRESSION_REPORT_v1.0.md | Design + QA | Unassigned | Pinned Chromium baselines generated and all diffs reviewed | Release readiness cannot be established | Before launch | Gate review | Withhold launch | No |
| 12 | Performance and bundle budgets | High | Blocked | Blocked pending evidence | PERFORMANCE_REPORT_v1.0.md; BUNDLE_ANALYSIS_REPORT_v1.0.md | Engineering | Unassigned | Final build measured against approved budgets | Release readiness cannot be established | Before launch | Gate review | Withhold launch | No |
| 13 | Production-like deployment and rollback rehearsal | High | Blocked | Blocked pending evidence | DEPLOYMENT_REHEARSAL_REPORT_v1.0.md; ROLLBACK_REHEARSAL_REPORT_v1.0.md | Infrastructure + Engineering | Unassigned | Documented rehearsal succeeds and is timed | Release readiness cannot be established | Before launch | Gate review | Withhold launch | No |
| 14 | Approved CRM/lead destination | High | Blocked | Blocked pending evidence | P14-001 | Sales Ops + Engineering | Unassigned | Approved vendor, credentials, mapping, retries, duplicates, sandbox, monitoring | Release readiness cannot be established | Before launch | Gate review | Withhold launch | No |
| 15 | Approved legal/privacy/form processing | High | Blocked | Blocked pending evidence | P14-002 | Legal + Privacy | Unassigned | Localized notice, legal basis, consent, retention, deletion, recipients, transfers approved | Release readiness cannot be established | Before launch | Gate review | Withhold launch | No |
| 16 | Approved analytics provider and consent | High | Blocked | Blocked pending evidence | P14-003 | Analytics + Legal | Unassigned | Provider, DPA, consent, region, retention, event policy approved | Release readiness cannot be established | Before launch | Gate review | Withhold launch | No |
| 17 | Distributed idempotency and abuse controls | High | Blocked | Blocked pending evidence | P14-004; P9-002 | Engineering + Sales Ops | Unassigned | Durable store, rate limit, duplicate policy, monitoring validated | Release readiness cannot be established | Before launch | Gate review | Withhold launch | No |
| 18 | Native French and Arabic review | High | Open | Blocked pending evidence | P9-005 | Localization + Content | Unassigned | Native reviewers approve all visible and metadata strings | Release readiness cannot be established | Before launch | Gate review | Withhold launch | No |
| 19 | Participant and accessibility acceptance research | Critical | Blocked | Blocked pending evidence | P9-001 | Research + Product | Unassigned | Required cohorts completed; S0/S1 findings fixed and retested | Release readiness cannot be established | Before launch | Gate review | Withhold launch | No |
| 20 | Canonical domain, brand assets, and public destinations | High | Blocked | Blocked pending evidence | P10-001; P10-002; destination registry | Product + Infrastructure + Design | Unassigned | Approved production origin, logo, legal, login, sales, support, tour, pricing destinations | Release readiness cannot be established | Before launch | Gate review | Withhold launch | No |
| 21 | Final source-control commit identity | Medium | Blocked | Blocked pending evidence | Supplied ZIP contains no .git metadata | Engineering | Unassigned | Commit final manifest and record immutable SHA | Release readiness cannot be established | Before launch | Gate review | Withhold launch | No |
| 22 | Final product approval | High | Not evaluated | Blocked pending evidence | No approved artifact supplied | See Phase 16 role matrix | Unassigned | Named accountable owner and explicit approval/evidence required | Uncontrolled production, legal, operational, or user harm | Before launch | Gate review | Withhold launch | No |
| 23 | Final content approval | High | Not evaluated | Blocked pending evidence | No approved artifact supplied | See Phase 16 role matrix | Unassigned | Named accountable owner and explicit approval/evidence required | Uncontrolled production, legal, operational, or user harm | Before launch | Gate review | Withhold launch | No |
| 24 | Claims and customer evidence approval | High | Not evaluated | Blocked pending evidence | No approved artifact supplied | See Phase 16 role matrix | Unassigned | Named accountable owner and explicit approval/evidence required | Uncontrolled production, legal, operational, or user harm | Before launch | Gate review | Withhold launch | No |
| 25 | Legal and privacy approval | High | Not evaluated | Blocked pending evidence | No approved artifact supplied | See Phase 16 role matrix | Unassigned | Named accountable owner and explicit approval/evidence required | Uncontrolled production, legal, operational, or user harm | Before launch | Gate review | Withhold launch | No |
| 26 | Consent approval | High | Not evaluated | Blocked pending evidence | No approved artifact supplied | See Phase 16 role matrix | Unassigned | Named accountable owner and explicit approval/evidence required | Uncontrolled production, legal, operational, or user harm | Before launch | Gate review | Withhold launch | No |
| 27 | Production analytics approval | High | Not evaluated | Blocked pending evidence | No approved artifact supplied | See Phase 16 role matrix | Unassigned | Named accountable owner and explicit approval/evidence required | Uncontrolled production, legal, operational, or user harm | Before launch | Gate review | Withhold launch | No |
| 28 | CRM and scheduler operational approval | High | Not evaluated | Blocked pending evidence | No approved artifact supplied | See Phase 16 role matrix | Unassigned | Named accountable owner and explicit approval/evidence required | Uncontrolled production, legal, operational, or user harm | Before launch | Gate review | Withhold launch | No |
| 29 | Production infrastructure and credentials | High | Not evaluated | Blocked pending evidence | No approved artifact supplied | See Phase 16 role matrix | Unassigned | Named accountable owner and explicit approval/evidence required | Uncontrolled production, legal, operational, or user harm | Before launch | Gate review | Withhold launch | No |
| 30 | Launch owner matrix | High | Not evaluated | Blocked pending evidence | No approved artifact supplied | See Phase 16 role matrix | Unassigned | Named accountable owner and explicit approval/evidence required | Uncontrolled production, legal, operational, or user harm | Before launch | Gate review | Withhold launch | No |
| 31 | Launch authorization | High | Not evaluated | Blocked pending evidence | No approved artifact supplied | See Phase 16 role matrix | Unassigned | Named accountable owner and explicit approval/evidence required | Uncontrolled production, legal, operational, or user harm | Before launch | Gate review | Withhold launch | No |
| 32 | Production deployment and live verification | High | Not evaluated | Blocked pending evidence | No approved artifact supplied | See Phase 16 role matrix | Unassigned | Named accountable owner and explicit approval/evidence required | Uncontrolled production, legal, operational, or user harm | Before launch | Gate review | Withhold launch | No |
| 33 | Post-launch monitoring completion | High | Not evaluated | Blocked pending evidence | No approved artifact supplied | See Phase 16 role matrix | Unassigned | Named accountable owner and explicit approval/evidence required | Uncontrolled production, legal, operational, or user harm | Before launch | Gate review | Withhold launch | No |