850 B
850 B
Phase 15 Repository Integrity Audit
Date: 2026-06-25
Status: Passed for static package integrity
Summary
The baseline manifest passed before changes. The Phase 15 audit checks JSON/CSV structure, symlinks, generated files, secret patterns, reserved test email domains, runtime URLs, dependency pinning, and release-control invariants.
Executed evidence
- Baseline manifest: 466 files verified.
- Baseline audit exposed 4 High and 7 Medium findings.
- Current audit reports zero findings under the same controls.
Unexecuted or blocked evidence
- Final package manifest validation occurs after all reports are generated.
- Git commit history was not supplied and cannot be audited.
Release disposition
Static repository integrity is acceptable, but it does not replace build, dependency, browser, or human QA evidence.