phase 16 implementation
This commit is contained in:
@@ -0,0 +1,21 @@
|
||||
# Phase 15 Failure Simulation Report
|
||||
|
||||
**Date:** 2026-06-25
|
||||
**Status:** Blocked for current execution
|
||||
|
||||
## Summary
|
||||
|
||||
Deterministic scenarios exist for success, duplicate, timeout, integration error, validation, and blocked configuration. Current browser/server simulations did not run.
|
||||
|
||||
## Executed evidence
|
||||
|
||||
- Source adapters and scenario guards reviewed.
|
||||
- Test scenarios remain disabled in production.
|
||||
|
||||
## Unexecuted or blocked evidence
|
||||
|
||||
- CRM/scheduler/analytics/consent/email/DNS/network/slow/partial/rate-limit/storage/script/CSP/offline failures.
|
||||
|
||||
## Release disposition
|
||||
|
||||
Authored scenarios are not observed resilience evidence.
|
||||
Reference in New Issue
Block a user